Sun-microsystems SERVER 1290 User Manual

Browse online or download User Manual for Computers Sun-microsystems SERVER 1290. Sun Microsystems SERVER 1290 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 76
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Sun Microsystems, Inc.
www.sun.com
Submit comments about this document at: http://www.sun.com/hwdocs/feedback
Netra
1290 Server Installation
Guide
Part No. 819-4372-10
May 2006, Revision A
Page view 0
1 2 3 4 5 6 ... 75 76

Summary of Contents

Page 1 - 1290 Server Installation

Sun Microsystems, Inc.www.sun.comSubmit comments about this document at: http://www.sun.com/hwdocs/feedbackNetra™1290 Server InstallationGuidePart No.

Page 2

x Netra 1290 Server Installation Guide • May 2006Shell PromptsTypographic ConventionsShell PromptC shell machine-name%C shell superuser machine-name#B

Page 3 - Contents

Preface xiRelated DocumentationThe documents listed as online are available at:http://www.sun.com/products-n-solutions/hardware/docs/Documentation, Su

Page 4

xii Netra 1290 Server Installation Guide • May 2006Sun Welcomes Your CommentsSun is interested in improving its documentation and welcomes your commen

Page 5

1CHAPTER1Unpacking and Installing the ServerThis chapter describes unpacking and installing the Netra 1290 server into a rack.Topics include: “Unpack

Page 6

2 Netra 1290 Server Installation Guide • May 2006FIGURE 1-1 Opening the Shipping Carton4. Cut the bands from the outer packaging and open the carton.S

Page 7

Chapter 1 Unpacking and Installing the Server 3FIGURE 1-2 Removing the Carton Pieces6. Remove the outer carton.SeeFIGURE 1-2.Outer cartonInternal sadd

Page 8

4 Netra 1290 Server Installation Guide • May 20067. Remove the internal saddle.SeeFIGURE 1-2.8. Lift off the server bag.9. Make a visual check to ensu

Page 9 - Using UNIX Commands

Chapter 1 Unpacking and Installing the Server 5This section is divided into the following: “Adjusting the Slide Rail Assembly” on page 5 “To Install

Page 10 - Typographic Conventions

6 Netra 1290 Server Installation Guide • May 2006Adjust the rear bracket or the adjustable bracket position to modify the length of theassembly. The s

Page 11 - Third-Party Web Sites

Chapter 1 Unpacking and Installing the Server 7FIGURE 1-4 Spring Clips and CutoutsThe spring clip should engage.Note – The spring clips must be above

Page 12 - Sun Welcomes Your Comments

PleaseRecycleCopyright 2006 Sun Microsystems, Inc., 4150 Network Circle, Santa Clara, California 95054, U.S.A. All rights reserved.Sun Microsystems, I

Page 13 - Unpacking the Server

8 Netra 1290 Server Installation Guide • May 20064. Repeat Step 1 through Step 3 for the second inner rail.▼ To Prepare the Rails for 2-Post Installat

Page 14 - Carton protection pads

Chapter 1 Unpacking and Installing the Server 9Installing the Slide Rail Assemblies in a Sun Fireor Sun StorEdge CabinetSun Fire™ and Sun StorEdge™ ca

Page 15 - 6. Remove the outer carton

10 Netra 1290 Server Installation Guide • May 20063. Insert the pins in the front bracket into cabinet holes 22 and 33 (FIGURE 1-6).FIGURE 1-6 Install

Page 16 - Installing Slide Rails

Chapter 1 Unpacking and Installing the Server 11a. Loosen the four nuts that secure the rear bracket.b. Reposition the rear bracket to the location ma

Page 17 - FIGURE 1-3):

12 Netra 1290 Server Installation Guide • May 2006a. Loosen the four nuts that secure the rear bracket.b. Reposition the rear bracket to the location

Page 18 - FIGURE 1-4)

Chapter 1 Unpacking and Installing the Server 13▼ To Install the Slide Rail Assemblies in the Top Position1. Remove the adjustable bracket on each rai

Page 19 - Spring Clips and Cutouts

14 Netra 1290 Server Installation Guide • May 2006b. Discard the adjustable bracket.2. Adjust the length of each slide rail assembly.a. Loosen the fou

Page 20 - FIGURE 1-3)

Chapter 1 Unpacking and Installing the Server 15▼ To Install the Slide Rail Assemblies in a 19-Inch 2-Post Rack1. Secure the front bracket with two No

Page 21

16 Netra 1290 Server Installation Guide • May 2006c. Repeat Step a and Step b for the second front bezel door.FIGURE 1-8 Releasing the Door Hinge Mech

Page 22 - FIGURE 1-6)

Chapter 1 Unpacking and Installing the Server 17FIGURE 1-9 Removing the Shipping Cradle Bolts▼ To Mount the Server in the CabinetCaution – The Netra 1

Page 23 - 900 Cabinet

iiiContentsPreface ix1. Unpacking and Installing the Server 1Unpacking the Server 1Installing Slide Rails 4Adjusting the Slide Rail Assembly 5Installi

Page 24 - Front bracket

18 Netra 1290 Server Installation Guide • May 2006Caution – The shipping cradle must be attached when the server is lifted. Failure todo so will resul

Page 25 - Post Cabinet

Chapter 1 Unpacking and Installing the Server 19FIGURE 1-11 Aligning the RailsInner railsOuter rails

Page 26 - Post Rack

20 Netra 1290 Server Installation Guide • May 2006Caution – The cabinet stabilizers (if applicable) must be extended or the cabinetmight topple when t

Page 27 - FIGURE 1-8)

Chapter 1 Unpacking and Installing the Server 2111. Press the green latches on each rail and push the server into the cabinet(FIGURE 1-13).FIGURE 1-13

Page 28 - FIGURE 1-9)

22 Netra 1290 Server Installation Guide • May 200614. Reattach the front doors of the server.Installing Slide Rail Lock NutsNote – Slide rail lock nut

Page 29

Chapter 1 Unpacking and Installing the Server 23FIGURE 1-15 Inserting and Tightening the Spacers5. Slide the server into the system cabinet.6. From th

Page 30 - (FIGURE 1-11)

24 Netra 1290 Server Installation Guide • May 2006Installing the Cable Management ArmThis section contains the following topics: “To Install the CMA–

Page 31 - Outer rails

Chapter 1 Unpacking and Installing the Server 25▼ To Install the CMA–Lite1. Secure the pivot at the end of the upper arm to the top rear of the server

Page 32 - Removing the Shipping Cradle

26 Netra 1290 Server Installation Guide • May 2006▼ To Install the CMA–800Refer to FIGURE 1-19, throughout the following procedure for identification

Page 33 - Securing screw Securing screw

Chapter 1 Unpacking and Installing the Server 271. Remove the hinge pin securing the pivot bracket to the upper CMA arm, whichfacilitates attaching th

Page 34 - To Install the Lock Nuts

iv Netra 1290 Server Installation Guide • May 2006Connecting Consoles to the System Controller 34Connecting the I/O Assemblies 37Installing Additional

Page 35 - FIGURE 1-16)

28 Netra 1290 Server Installation Guide • May 2006FIGURE 1-21 Attaching the Upper CMA Arm and Pivot Bracket3. Remove the hinge pin securing the pivot

Page 36 - SSC1 SSC1

Chapter 1 Unpacking and Installing the Server 29FIGURE 1-22 Attaching the Lower CMA Arm and Pivot Bracket5. After attaching the bracket to the chassis

Page 37 - To Install the CMA–Lite

30 Netra 1290 Server Installation Guide • May 2006FIGURE 1-23 Attaching the Left-Hand T-Bracket7. Secure the right-hand T-bracket to the right-hand sl

Page 38 - To Install the CMA–800

Chapter 1 Unpacking and Installing the Server 31FIGURE 1-24 Attaching the Right-Hand T-Bracket8. Secure the upper CMA arm to the left-hand T-bracket u

Page 39 - FIGURE 1-20 and FIGURE 1-21

32 Netra 1290 Server Installation Guide • May 2006FIGURE 1-25 Attaching the Upper and Lower CMA Arms to the T-Bracket9. Secure the lower CMA arm to th

Page 40 - Upper CMA arm

Chapter 1 Unpacking and Installing the Server 33Connecting Power CablesCaution – The Netra 1290 server is designed to work with power systems having a

Page 41 - Lower CMA arm

34 Netra 1290 Server Installation Guide • May 2006Note – It is the installer’s responsibility to ensure that the cabinet has sufficientelectrical powe

Page 42 - Left hand T-bracket

Chapter 1 Unpacking and Installing the Server 35LOM Serial A port connects directly to an ASCII terminal or a network terminalserver (NTS) using a com

Page 43 - Right hand T-bracket

36 Netra 1290 Server Installation Guide • May 2006FIGURE 1-26 System Controller and I/O Assembly Locations▼ To Connect the Administrative ConsoleOnce

Page 44 - FIGURE 1-25)

Chapter 1 Unpacking and Installing the Server 37Connecting the I/O AssembliesThe I/O assemblies provide network interface and peripheral access to the

Page 45 - Connecting Power Cables

vFiguresFIGURE 1-1 Opening the Shipping Carton 2FIGURE 1-2 Removing the Carton Pieces 3FIGURE 1-3 Slide Rail Assembly (Standard Configuration) 5FIGURE

Page 46 - Controller

38 Netra 1290 Server Installation Guide • May 2006additional information refer to:http://www.sun.com/ioInstalling Additional Peripheral DevicesWhen yo

Page 47 - FIGURE 1-26)

39CHAPTER2Setting UpThis chapter describes how to power on your server using the system controllercommand-line interface (LOM prompt), how to set up t

Page 48

40 Netra 1290 Server Installation Guide • May 20068. Booting the Solaris Operating System.9. Installing the Lights Out Management packages from the Su

Page 49 - Connecting the I/O Assemblies

Chapter 2 Setting Up 412.0.1 Disabling Operation of the On/Standby Switch● To disable the On/Standby switch, use the setupsc command.Powering On the S

Page 50

42 Netra 1290 Server Installation Guide • May 2006The server powers on completely. The System Active indicator illuminates and theserver executes the

Page 51 - Setting Up

Chapter 2 Setting Up 43▼ To Bring the System to Standby Mode From theSolaris Command Line● At the system prompt, type:▼ To Bring the System to Standby

Page 52 - On/Standby Switch

44 Netra 1290 Server Installation Guide • May 2006● For an abrupt power off, press the left side of the On/Standby switch and hold itfor at least four

Page 53 - Powering On the Server

Chapter 2 Setting Up 452. At the Enter new password prompt, type your password.3. At the Enter new password again prompt, re-type your password.If you

Page 54 - ■ By the On/Standby switch

46 Netra 1290 Server Installation Guide • May 2006Use CODE EXAMPLE 2-1 as a guide for the information you need to enter for eachparameter value entry.

Page 55 - Do you want to continue? [no]

Chapter 2 Setting Up 472. To power on the server, type poweron.Depending on the setting of the OpenBoot PROM auto-boot? parameter, theserver attempts

Page 56 - Setting Up the Server

vi Netra 1290 Server Installation Guide • May 2006FIGURE 1-21 Attaching the Upper CMA Arm and Pivot Bracket 28FIGURE 1-22 Attaching the Lower CMA Arm

Page 57 - Enter new password again:

48 Netra 1290 Server Installation Guide • May 2006These packages are available from the Solaris software download center at:http://www.sun.com/downloa

Page 58 - Operating System

Chapter 2 Setting Up 49i.drivers (INFO): Installing /var/tmp/SUNWlomr/reloc/platform/sun4u/kernel/drv/sparcv9/lomvi.drivers (INFO): Identified drivers

Page 59 - Packages

50 Netra 1290 Server Installation Guide • May 2006Note – The warning messages concerning lomp, lomv, and lom driver attachmentseen during the installa

Page 60 - To Install the LOM Drivers

Chapter 2 Setting Up 51CODE EXAMPLE 2-4 Installing the LOM Manual Pages# pkgadd -d . SUNWlommProcessing package instance <SUNWlomm> from </ex

Page 61

52 Netra 1290 Server Installation Guide • May 2006

Page 62 - To Install the LOM Utility

53APPENDIXANetra 1290 Server ConnectionsThis appendix describes the cables and connectors available to complete theinstallation. Topics include: “Ext

Page 63 - Chapter 2 Setting Up 51

54 Netra 1290 Server Installation Guide • May 2006FIGURE A-1 External I/O Connection LocationsPCI+ IB_SSC AssembliesNote – Do not mix different cards

Page 64

Appendix A Netra 1290 Server Connections 55SCSI ConnectorThe SCSI connector is a 68-pin SCSI connector (FIGURE A-2). TABLE A-1 lists the pinoutinforma

Page 65 - Netra 1290 Server Connections

56 Netra 1290 Server Installation Guide • May 2006SCSI ImplementationFor PCI+ IB_SSC assemblies the embedded SCSI subsystem is a SCSI Ultra-320(Ultra

Page 66 - PCI+ IB_SSC Assemblies

Appendix A Netra 1290 Server Connections 57NET0/NET1 Ethernet PortsThe NET0/NET1 Ethernet ports are shielded RJ-45 connectors (FIGURE A-4). TheNET0/NE

Page 67 - SCSI Connector

viiTablesTABLE A-1 68-Pin SCSI Connector Pinout 55TABLE A-2 68-Pin SCSI Connector Pinout (continued) 56TABLE A-3 Alarms Service Port Connector Pinout

Page 68 - Alarms Port

58 Netra 1290 Server Installation Guide • May 2006FIGURE A-4 RJ-45 Gigabit Ethernet Connectors10/100BASE-T LOM Ethernet PortThe 10/100BASE-T LOM Ethe

Page 69 - NET0/NET1 Ethernet Ports

Appendix A Netra 1290 Server Connections 59Twisted-Pair Ethernet Cable-Type ConnectivityThe following types of TPE cables can be connected to the 8-pi

Page 70 - 4 TRD2_H 8 TRD3_L

60 Netra 1290 Server Installation Guide • May 2006FIGURE A-6 RJ-45 Serial ConnectorsNote – Serial port B is reserved.TABLE A-8 lists the settings nee

Page 71 - ■ Category 4 (STP-4)

Appendix A Netra 1290 Server Connections 61Using a DB-25 Adapter for Your Serial LinkTo connect from a terminal, use either the DB-25 (25-Pin DSUB mal

Page 72 - Serial B

62 Netra 1290 Server Installation Guide • May 2006

Page 73 - TABLE A-9 lists the pin

63IndexAadjusting slide rails, 5administrative console, 35alarm connector, 56Ccable lengths, 59cable management armCMA-800, installing, 26CMA-Lite, in

Page 74

64 Netra 1290 Server Installation Guide • May 2006bottom position, 9, 11inner, 6lock nuts, 22Sun Fire or StorEdge cabinet, 9Sun Rack 900 cabinet, 11,

Page 75

viii Netra 1290 Server Installation Guide • May 2006

Page 76

ixPrefaceThe Netra 1290 Server Installation Guide provides detailed procedures that describethe installation, power-on, and configuration of the Netra

Comments to this Manuals

No comments